编者按:一年之内,这块曾是采煤区的土地如今成为一片宝贵的公共公园,同时也成为了发展南湖生态城的提速剂。

Within only one year a former mined area in Tangshan, southeast of Beijing, was transformed into a valuable 5.9 square kilometer public parkland that has become the catalyst for the development of the South Lake Eco-Town.

Article Source: Zheng, Xiaodi. South Lake Central Park. TOPOS, VOL. 69. December, 2009.

声明:此文为正式授权文章,已征得作者同意在风景园林新青年(Youth Landscape Architecture)上发表,不得转载,需要授权转载发布者,请联系作者或TOPOS杂志(www.topos.de)
Notice: This article is a reprinted version with the official permission of the author. Do not copy without permission.

Tangshan, 200 kilometers southeast of Beijing, is an important heavy industrial coastal city in Hebei Province,North China.With a manufacturing history of over 100 years, the city is known as the birthplace for China’s modern industry. In 1877, the first mechanized coal mine, Kaiping Coal Mine (later known as Kailuan Coal Mine) was built in Tangshan, which established coal mining as one of the pillar industries in the city.

While the city was booming, an earthquake registering 7.8 magnitude hit unexpectedly in early morning of 28 July 1976.More than 240,000 people lost their lives, with 160,000 critically injured – making it the deadliest earthquake of the 20th century. It leveled most of the city, destroying 93 percent of residential buildings and damaging infrastructure throughout.With a 30-year effort of restoration and construction, the city was able to rebuild and was granted the United Nations’ Habitat Scroll of Honor Award in 1990.

According to the Tangshan city government website, the city’s GDP and overall financial revenue in 2006 exceeded 236.2 billion RMB (34.5 billion US dollars) and 26.4 billion RMB (3.87 billion US dollars). Now, however, the cost of years of natural resource exploitation is evident. More than 100 square kilometers of land collapsed within the city range due to coal mine excavations. An area of 28 square kilometers sunk within the South Lake District south of downtown Tangshan. Due to the high elevation of groundwater in this region, a sink hole was formed. Additionally, the area, used as the city’s landfill for decades, contained earthquake debris, construction and domestic waste, as well as coal dust. A volume of 289,800 tons of waste material was disposed here annually. Immediately before its closure, the landfill held 4.5 million tons of garbage, which formed a mound as tall as 50 meters. Unbearable living conditions forced many residents to relocate.

The South Lake District has long been regarded as a foul, contaminated and derelict area that is almost impossible to develop.However, the city’s population is growing and the demand for developed land is high. In 1996, the city made its first attempt to remediate a 130 hectare site in the South Lake District and develop it into the Little South Lake Park. Through years of effort, this park has proved to be a big success and was awarded the Dubai International Award for Best Practices in 2004 for improvement of the environment. Not only does it show the public and city authorities that this wasted land could be remediated and transformed into valuable public space, but also the intense public usage reveals citizens’ high demand for more open space in the city. From 2004 to 2005, the Tangshan Planning Bureau organised an international competition on Urban Design for South Lake District. First prize went to the office of Latz + Partner, Germany, whose proposal called for a large water surface and two “ribbons of leisure”, with one along the road system and the other along the lake.

High demands for development

The final push for the realisation of South Lake Park came from the strong political wish of city administrators. In October 2006, Yong Zhao stepped up as the new party secretary of Tangshan city. Shortly after, a series of moves were made regarding the city’s development. The South Lake district and its surrounding area of 91 square kilometers were named as the South Lake Eco-Town with a set of sustainable approaches planned.The following year the Hebei provincial government set a new goal for cities to improve their urban appearance as “A great leap each year; a dramatic change in three years.” South Lake Eco-Town became one of four new towns to be developed in Tangshan. A seismic microzoning report by Tangshan Seismological Bureau and a geological hazard risk assessment by Tangshan Land and Resources Bureau revealed that the majority of land in South Lake Eco-Town district had reached a stable status and was ready for development.

In early 2008, Peng Lin became the new director of the Urban and Rural Planning Bureau of Tangshan and was faced with the urgent task of making a “dramatic change” to the city’s image within three years. An international competition was held in October for the master plan of the 91 square kilometer South Lake Eco-Town. Four design institutions were invited: China Academy of Urban Planning & Design, Beijing Tsinghua Urban Planning & Design Institute (THUPDI), ISA Internationales Stadtbauatelier, and J.A.O. Design International Architects & Planners. Planning proposals were submitted in January 2009. As a result of this competition, each participant received a piece of the project for further development.

THUPDI worked on the eco-town central core,which occupies an area of 38.8 square kilometers, including the future administration, business and financial center; materials distribution and delivery center; and residential area, as well as the 28 square kilometer South Lake Ecological Park. THUPDI collaborated with China Coal Research Institute Tangshan Branch, The Institute of Crustal Dynamics in China Earthquake Administration and Kailuan Group. The stability of each land parcel and its suitability for supporting permanent structures were identified via a comprehensive analysis of various factors, including: land use, earthquake fault zone, mine subsidence areas, land permeability, soil productivity, biological diversity, surface water system and landscape visual value, etcetera.

A detailed master plan of the core area was delivered in February and received a warm reception from city authorities. Still recovering from the extensive work to prepare their submission for the core area planning, the design team was notified with the important yet startling news that their depiction of the park looked so convincing that government administrators had decided to build it immediately. The opening date of the 5.9 square kilometer South Lake Central Park (the first phase of South Lake Ecological Park) was set for 1 May 2009 to welcome the International Labour Day crowd.

Efficient construction methods

To meet this urgent deadline, THUPDI sent an on-site design team of six to Tangshan on 10 February. It was comprised of a senior consultant in charge of construction documents and supervision, a project manager and four landscape designers. They lived near the project site and worked in an on-site office to generate construction details, respond to unexpected site conditions, coordinate with contractors and civil engineers and report to city officials on project progress.To facilitate the park’s construction, the government also assigned specific city officials to conduct “five on-site working methods” including: official working on-site, decision carried into action on-site, problems solved on-site, innovation encouraged on-site and achievements appraised on-site. As a heavy industrial city, Tangshan is well supplied with heavy construction and delivery machinery. The municipal government made full use of this and gathered all necessary construction teams on the park site. At times 500 heavy pieces of equipment and trucks were working simultaneously, and more than four million cubic meters of coal dust was removed in three days. Through these great efforts, the official public opening occurred on 1 May 2009.

The park design

The most stunning focus of South Lake Central Park is its two square kilometer water body, which hosts a variety of water activities. The park’s north and northwest edges border the future administrative center. A grand plaza is designed to serve as the forecourt of the administrative center and provide a gathering space for large events. The coal dust hill sitting on the northeast border of the park will become a botanical garden. South of the garden, a diagonal road bisecting the lake travels southwest and connects to the Phoenix Terrace (the former waste site) on the west edge of the park. Approximately 80 million RMB (11.72 million US dollars) was spent to reclaim the landfill, with Shanghai Municipal Engineering Design Institute taking charge of the cleaning process and THUPDI overseeing the planting scheme. The apex of Phoenix Terrace has become the best spot for viewing the entire scheme. Inspired by traditional Chinese landscapes, several islands were created in the center of the lake to preserve existing groves of trees, while some feature tea houses, pagodas, and an amphitheater.

Ecological Park has lived up to its name. Many ecological measures were implemented during the park’s creation; this helped to condense the construction period. Most existing vegetation was preserved and native species were identified and bought from local nurseries. The huge amount of coal dust accumulated on the site was used to create land forms and to build foundations for pathways. The remainder was sold to local factories for cement and concrete production. A new technology was applied to the formation of the lake banks. Utilizing dead tree trunks, stems and branches to form a grid to hold soil in place, it provides habitat for insects. Terraced pedestrian pathways lead down from the Phoenix Terrace to the central lake with its newly constructed islands.The former landfill is completely covered by green and aquatic organisms. No concrete or brick was used to create hard water edges, which saved materials transportation labor, reduced environmental pollution and shortened the construction cycle. Street lamps are solar powered and the visitor shuttles are electric powered. “The South Lake Central Park aims to reclaim this derelict land and to restore its ecosystems on multiple levels. The goal is to integrate history, culture, ecology and recreation; to provide a healthy and vibrant open space the local residents have longed for; and to go one step further in building a more sustainable environment,” stated Jie Hu, chief designer of the park and director of the Planning & Design Branch of Landscape Architecture in THUPDI.

The South Lake Eco-Town is expected to be completed by 2015 and support a population of 400,000. South Lake Central Park has become a catalyst to accelerate this development. Standing atop Phoenix Terrace,overlooking the crowds enjoying the park, one can’t help being amazed that this city green was created within one year.However, one might also wonder whether it was necessary to set the tight deadline, abbreviate the design phase, and hasten the construction process. Are instant landscapes sustainable? While the power to decide how fast landscapes need to be constructed is out of the hands of landscape architects in China, a more practical perspective would be to examine how they can participate in this process and influence the final result.



无觅相关文章插件,快速提升流量

风景园林新青年

风景园林新青年

13 discussions
  1. Dorinda07 says:

    额。。。有点儿好奇,这次的没有翻译么?

  2. 钟惠城 says:

    最精彩应属最后一段引出的思考和话题:站在凤凰山上,眺望着使用公园的人群,人们不禁惊叹于这块城市绿地一年里发生的变化。然而,人们也想知道,到底是否真的需要为其赋予如此紧张的期限、简化设计阶段、缩短建设周期?这样的景观真的可持续吗?

  3. lucia says:

    偶的亲爱的家乡,必须顶~不过很久没回去了,去年的时候还是很漂亮滴~

  4. 凤梨罐头 says:

    其实并不如想象中的好,凤凰山的那个形体也比较囧

  5. 安友丰 says:

    过一段时间给大家讲“凤凰涅槃”的故事——————寻根溯源唐山南湖的变迁……

  6. 冯潇 says:

    看到南湖垃圾山有些感慨~~~~小城同志理解啊

Leave a Reply

Your email address will not be published. Required fields are marked *

风景园林新青年

风景园林新青年

俞昌斌 城市建设 现代主义 设计未来城市 冯纪忠 学习方法 城市空间 野生动物廊道 职业实践 LIM 华盛顿 贝聿铭 景观都市主义 韩国 普渡大学 Kingston University 铺地 BIM 太阳能 散步道 Xeritown 园博会 水盒子 教学 可持续城市 铺装 论坛 广场 Prof. Gesche Joost 书评 宾夕法尼亚大学 佛罗里达 天津大学 logo 参数化设计 刘秀晨 Juergen Weidinger 王劲韬 风景园林学会2011年会 多伦多 巴塞罗那 北角公园 挪威 清华 证书 居住区 罗马奖 辰山植物园 纽约 英国 布法罗河湾散步道 绿道 地域性景观 合作 日本 万科 德国市民花园 禅修 TOPOS 鹈鹕湾 雪铁龙公园 摄影 空气污染 James Corner 裁员 牛雄 保护 鸟类 WEST8 视觉文化 志愿者 绿墙 如园 教育 Dr. Rosan Chow 台湾 Prof. Jürgen Weidinger 庭院 反思 朱胜萱 朱育帆 香格里拉植物园 2012IFLA 灾后 矶琦新 Gleisdreieck 概念方案 LABash 竞赛 风景园林新青年,就在你身边 哈佛 迪拜 步行街 几何 Malden 陈俊愉 绿色基础设施 Julius Fabos 钢笔画 枯山水 喷泉 NITA 珊瑚礁 世界风景园林师高峰论坛 毛细水 考研 银泉市 Silver Spring 青海 洪盈玉 法国 视频 布鲁克林 维格兰 五角大楼 非言述性和默会性知识 buffalo 机场 历史 公益 可持续化 土人景观 棕地 美国 Prof. Wolfgang Jonas Ruggeri 北川 空间 植物 Waterboxx 自然文化资源 地砖 鹿特丹 希望小学 华南 风景园林学 Michael Van Valkenburgh and Associates 公共交通 西班牙 图解 跨学科教育 SANAA 调查问卷 自然观 教学元素 手绘 翻译 理论 场所 西方建筑 德国 创业 托滕堡公园 地震 广州市绿化公司 低收入住宅 骑行 伊利诺伊大学 UIUC Jack Ahern 政治 数字景观 湿地 设景 2012IFLA亚太区会议 设计研究 行业 城市雨水 垃圾 商业建筑 雕塑公园 洛阳 北林 Brownfield 设计竞赛 瑠公圳 碛口古镇 长椅 公园 设计展 城市景观 风景园林 方塔园 王欣 加州花园 加拿大 香港 苏州古典园林 ARC 风景园林学会2013年会 钓鱼岛 盐湖城 Gesche Joost IFLA 北欧 纪念性景观 9.11 ASLA学生奖 实验 留学 新青年读老经典 雨洪管理 Mader AGER 安友丰 海平面上升 张乔松 清华同衡学术周 人居环境 区域园林 数字图解 原子城 迪士尼音乐厅 欧洲 公共花园 Vertical Greening Systems 雨水 风景区 岭南园林 Peter Walker 墨西哥 河流 古根海姆博物馆 龙安寺 LEPC 可持续 Ron Henderson 宋晔皓 日本设计 儿童 讲座 马萨诸塞大学 UMass 禅意 植物园 树屋 康奈尔大学 客座教授 生态 安藤忠雄 多样性 国家公园 保研 会议 风景园林月 IGA 人文 休斯顿探索公园 碳补偿林 苗木 护栏 毕业设计 经验 绿色屋顶 老人 风景园林学会2015年会 张唐景观 绿色设计 批评 花园 Hans Joachim Mader 南湖中央公园 联谊 沙龙 捷得国际 年报 永昌河 西安世园会 便携 维吉尼亚理工大学 卡尔维诺 年会 游乐场 城市 MLA 布鲁克林大桥 展览 托马斯·丘奇 京津冀 纪念碑 滨水 孟兆祯 Media Ship 雕塑 就业 流浪汉 首尔 博士 新年 校园 深圳前海 意识形态 枡野俊明 购物中心 历史理论 Prof. Nigel Cross RTD Prof. Loidl-Reisch Greenway 檀馨 夏成钢 世博 旅游 盆景园 GSD 工程 环境 城乡 三倾园 Stoss Landscape Urbanism 美术馆 中央公园 铁路 数字化 水景 Diana Balmori 北京 LAM 水文 马克 狼牙山 弗吉尼亚大学 UVa 沥青 SWA 经典 交通节点 新加坡 哈普林 halprin 马晓暐 住宅花园 玛莎·施瓦茨 文化景观 预制混凝土 Vista Hermosa 沃夫岗·哈勃 种植 2013北京园博会 开放空间 成范永 何巧女 新西兰 纵向耕作 环境效应 国际风景园林师高峰论坛 低能耗 技术 自杀 ASLA 幻觉 上海 什刹海 迪士尼 Disney TAMU 种植装置 泰山 韩炳越 建筑